Loaded at our shop in the afternoon. Installed that evening, and through the night. By morning, the smart restroom was in place at Montréal-Trudeau airport and the site was back to its normal rhythm. At an airport, the work window is short and it doesn’t stretch. Here’s a full installation, from loading to handover.