April 21 2026

In April 2026, Colorado media filmed the installation of our double unit at Aga Park in Fountain. One crane, one afternoon, and the park finally had a washroom that works.

A few months earlier, parents were telling local TV they left the park entirely and drove home when their kids needed a bathroom. The old building’s door was locked most of the time.

That week, a crane set a double Urben Blu unit down on the same spot. It’s the kind of job measured in hours, not months: the building shows up finished, and all that’s left is hookups and the concrete around it.

What changes for Fountain: floor-level jets that wash the unit between visits, soap and paper that restock themselves, automatic locking, vandal-resistant walls. And no more city crews driving out to the park several times a day.

Open to the public about two weeks after installation — just in time for the splash pad, which reopens on Memorial Day weekend.

Watch the installation on 9news.com → https://www.9news.com/article/life/style/colorado-guide/smart-bathroom-fountain-colorado-park/73-a562ee1d-d8d5-451f-b955-bf3a1a6e2cbf